Difference between revisions of "Flasher Hub (Legacy)"
(Created page with "This is the user documentation for owners of SEGGER debug probes (J-Link and J-Trace). TBD __TOC__ = Getting started = TBD") |
|||
Line 1: | Line 1: | ||
− | This is the user documentation for owners of SEGGER |
+ | This is the user documentation for owners of a SEGGER Flasher Control Server. |
+ | |||
+ | __TOC__ |
||
+ | |||
+ | = Getting started = |
||
+ | |||
+ | Before putting the Flasher Control Server into operation, make sure to have the following devices at hand: |
||
+ | * Flasher Control Server |
||
+ | * Power supply (see [[#Power_supply | below for more information]]) |
||
+ | * One or more SEGGER Flashers (see [[#Supported_Flashers | below for more information]]) |
||
+ | * Ethernet cable (Only needed for [[#TELNET | operating Flasher Control Server via TELNET]]) |
||
+ | |||
+ | The Flasher Control Server is set up and good-to-go in less than 30 minutes |
||
+ | |||
+ | |||
+ | = Host interfaces = |
||
TBD |
TBD |
||
+ | == FTP == |
||
− | __TOC__ |
||
+ | == TELNET == |
||
+ | == RS232 / UART == |
||
− | = Getting started = |
||
+ | |||
+ | |||
+ | = Supported Flashers = |
||
+ | |||
+ | TBD |
||
+ | |||
+ | = Power supply = |
||
TBD |
TBD |
Revision as of 18:59, 2 March 2021
This is the user documentation for owners of a SEGGER Flasher Control Server.
Contents
Getting started
Before putting the Flasher Control Server into operation, make sure to have the following devices at hand:
- Flasher Control Server
- Power supply (see below for more information)
- One or more SEGGER Flashers (see below for more information)
- Ethernet cable (Only needed for operating Flasher Control Server via TELNET)
The Flasher Control Server is set up and good-to-go in less than 30 minutes
Host interfaces
TBD
FTP
TELNET
RS232 / UART
Supported Flashers
TBD
Power supply
TBD